A study of the mains voltage profile at the hotel identified that the site was being supplied with excess voltage. Calculations based on the type and number of electrical loads at the Hotel, together with an understanding of the existing voltage profile, revealed that the site would benefit significantly from Voltage Optimisation. A Voltage Optimiser system was installed at the hotel in November. This report contains an analysis of the savings which have been achieved as a result of the installation. It is worth noting that we are using August as our base period, of which we are comparing against, simply because the half hourly data is not available 12 months previously.

BALMORAL LOGO

Customer Comment:

“The 3 PFC units were professionally installed and commissioned on time with minimum disruption
as planned.”

Gary Jenkins, Engineering Maintenance Manager, Klinge Chemicals